News

Officials from the National Capital Region Transport Corporation (NCRTC) said the RRTS station here will soon become the ...
The last pending station on the Delhi-Ghaziabad-Meerut Regional Rapid Transit System (RRTS) corridor at Sarai Kale Khan is all set to begin operations. Its inauguration is likely to be held on ...
Ghaziabad: Trial runs on the 23km Meerut metro-cum-rapid rail corridor, which began this Feb, have been completed and the ...
Meerut Metro trial runs are complete, with three-coach trains testing at 13 stations. The 82km RRTS project is set for ...
The Sarai Kale Khan RRTS station is ready to open soon. It will likely be inaugurated on September 17. This station will ...
According to the NCRTC officials, the ETCS Level 2 signalling system allows trains from different operators to run on shared infrastructure, eliminating dependence on a single vendor for future ...
The corridor currently sees a daily ridership of 60,000 and it is expected to take one lakh cars off the road, once fully ...
According to a National Capital Region Transport Corporation report, land prices in Meerut have surged between 30% and 67% ...
The much-awaited semi-high-speed Namo Bharat trains and Meerut Metro, the country’s first integrated corridor leveraging the European Train Control System (ETCS) Level 2 signalling to allow ...
Gurgaon: Union minister of state for planning and statistics and city MP Rao Inderjit Singh has urged the Centre to expedite ...
The National Capital Region Transport Corporation (NCRTC), in coordination with the Uttar Pradesh Police, has constructed police posts near Sahibabad and Ghaziabad Namo Bharat stations to strengthen ...